How drawings, panel inspection, simulation and witnessed testing reduce uncertainty before installation.
Test against an agreed basis
A useful FAT begins with approved drawings, an I/O list, sequence descriptions and acceptance criteria.
Include normal and abnormal states
The best test plans cover permissives, trips, communication loss and recovery—not only the normal operating sequence.
Close findings visibly
A structured punch list, ownership and retest record make the route from observation to acceptance transparent.