- End user
- Jindal Stainless Steel Jajpur
- Client
- Vortex Enterprise
- Site location
- Jajpur,Odisha
- Commissioned on
A process-control panel engineered to connect PLC hardware, field signals and drive interfaces in a structured system ready for software integration and site commissioning.
Project details
- i. Argon Purging system for electrical furnace ii. Siemens S7-1200 PLC with KTP700 Basic HMI for Argon Flow Control by using Mass Flow Controller iii. Advantages : Less wastage of Argon, Precise flow control of Argon gas, Visualization and data logging facility for future
engineering
verificationany questions?


-1.png&w=3840&q=75)
.png&w=3840&q=75)